Plano

Baylor Scott & White Emergency Expansion

Plano

Baylor Scott & White Emergency Expansion

Baylor Scott & White Emergency Expansion project details
Project NameLocationGeneral ContractorArchitect / EngineerCompletion DateProject Category
Baylor Scott & White Emergency ExpansionPlano, TXSkiles GroupPage Southerland Page, Inc.7/30/2026Healthcare

Overview

Amber Electrical provided a complete electrical and fire alarm package for Baylor Scott & White Health Medical Center Plano Regional Emergency Expansion. The project included electrical installations, lighting and controls, power distribution, electrical demolition, and fire alarm system modifications. Amber coordinated closely with the project team to deliver reliable electrical systems while meeting hospital requirements, safety standards, and construction schedules.

Scope of Work

  • Electrical Installation: Furnished and installed electrical systems and associated equipment in accordance with project documents and applicable codes.
  • Lighting & Controls: Installed lighting fixtures and lighting control systems, including testing and owner training.
  • Power & Distribution: Provided electrical pathways, conduit, junction boxes, grounding, bonding, and power connections for project systems and equipment.
  • Fire Alarm Systems: Installed and coordinated a complete fire alarm system, including device relocations, programming, and maintaining system operation during construction.
  • Demolition & Modifications: Completed electrical and fire alarm demolition, made safe existing systems, and rerouted existing electrical rough-ins as required.
  • Specialty Systems: Provided electrical coordination and connections for X-ray in-use indicators and other equipment shown in the contract documents.
  • Phased Construction & Coordination: Coordinated shutdowns, inspections, and installation activities with hospital operations and other trades.
  • Testing & Closeout: Completed required inspections, testing, documentation, labeling, panel schedule updates, and project closeout requirements.