Plano
Baylor Scott & White THH ED Renovation
Plano
Baylor Scott & White THH ED Renovation
| Project Name | Location | General Contractor | Architect / Engineer | Completion Date | Project Category |
|---|---|---|---|---|---|
| Baylor Scott & White THH ED Renovation | Plano, TX | Skiles Group | Environments for Health / Certus Consulting | 1/08/2027 | Healthcare |
Overview
Amber Electrical provided comprehensive electrical and fire alarm services for the Baylor Scott & White THH Emergency Department Renovation in partnership with Skiles Group. The project involved phased construction within an active healthcare facility, requiring careful coordination to maintain hospital operations and meet strict infection control and safety protocols. Amber’s work included electrical system upgrades, lighting and controls, power distribution, electrical demolition, and fire alarm modifications to support the renovated emergency department. The team coordinated closely with the general contractor and hospital staff to complete the work safely and efficiently while minimizing disruptions to patient care.
Scope of Work
- Complete Electrical Installation: Furnished all labor, materials, and equipment necessary to install a complete electrical system in accordance with project specifications and contract documents.
- Lighting & Controls: Installed light fixtures, lighting control devices, relays, wall devices, and battery backup systems.
- Power Distribution: Provided and installed panelboards, enclosed circuit breakers, electrical labeling, and identification.
- Fire Alarm Systems: Coordinated through Convergint Technologies to provide a revised fire alarm system and updated fire alarm plans to accommodate the renovated layouts.
- Emergency Notifications: Installed low-frequency audible notification devices in accordance with project requirements.
- Electrical Demolition: Completed required electrical demolition and made safe existing systems within the renovation areas.
- Temporary Lighting: Provided temporary construction lighting throughout the designated work areas.
- System Shutdowns & Coordination: Coordinated electrical shutdowns with hospital operations, including off-hours manpower and shutdown planning.
- Phased Construction: Completed electrical work across five construction phases while coordinating with other trades and maintaining hospital operations.
- Testing & Closeout: Provided system testing, inspections, lighting control programming, as-built drawings, warranties, and closeout documentation.