Fort Worth
Crescent Hotel
Fort Worth
Crescent Hotel
| Project Name | Location | General Contractor | Architect / Engineer | Completion Date | Project Category |
|---|---|---|---|---|---|
| Crescent Hotel | Fort Worth, TX | Applied Climate Solutions | OZ Architecture and Applied Climate Solutions | October 2025 | Service |
Overview
- Timeline: Priced in April 2025, finished October 2025.
- Contract price: Started at $177K and quickly moved to $270K.
- Delivery Method: Beck was the GC then subbed to Applied Climate who subbed Amber.
Scope of Work
- Provide power to large RTU from basement to roof.
- Installed decorative lighting in courtyard.
- Installed 200amp inlet for catering services.
Obstacles
- Hotel was occupied.
- New high-profile general contractor.
- Integrating the lights with an older lighting system.
- Time had to be entered in WrapX, which is a tracking system that large general contractors use.
- Bulk of work done off scaffolding.
- The entire structure was post-tensioned. All penetrations down to a Tapcon needed to be scanned.
- Main switchgear had dangerous levels of fault current and arc flash boundaries. Had to use a chicken switch to de-energize the gear to perform our work.
- Numerous change orders.