Crescent Hotel project details
Project NameLocationGeneral ContractorArchitect / EngineerCompletion DateProject Category
Crescent HotelFort Worth, TXApplied Climate SolutionsOZ Architecture and Applied Climate SolutionsOctober 2025Service

Overview

  • Timeline: Priced in April 2025, finished October 2025.
  • Contract price: Started at $177K and quickly moved to $270K.
  • Delivery Method: Beck was the GC then subbed to Applied Climate who subbed Amber.

Scope of Work

  • Provide power to large RTU from basement to roof.
  • Installed decorative lighting in courtyard.
  • Installed 200amp inlet for catering services.

Obstacles

  • Hotel was occupied.
  • New high-profile general contractor.
  • Integrating the lights with an older lighting system.
  • Time had to be entered in WrapX, which is a tracking system that large general contractors use.
  • Bulk of work done off scaffolding.
  • The entire structure was post-tensioned. All penetrations down to a Tapcon needed to be scanned.
  • Main switchgear had dangerous levels of fault current and arc flash boundaries. Had to use a chicken switch to de-energize the gear to perform our work.
  • Numerous change orders.