Carrollton, Texas
By: Amber Electrical Contractors
We’re proud to deliver this 100% design-build project, bringing reliable, modern, and future-ready electrical infrastructure to our client.
Started Pricing: 2022
Completion: September 2025
Design-Build & Engineering
Engineered drawings developed from Electrical Engineer
Engineered switchgear and generator pad drawings from Structural Engineer
Complete coordination study and arc flash analysis
Demolition & Removal
Removed three outdated generators
Removed 50-year-old paralleling gear (housed in the Titanic wheelhouse)
New Installation
Installed 3000-amp Service Rated Transfer Switch
Installed 3000-amp Switchgear
Replaced three generators with a new 500KW generator, designed for future paralleling capacity
Implemented load bank testing and a remote monitoring system
Safety & Continuity
Four-day installation completed with crews working around the clock
Temporary UPS and pull-behind generator safely backed up the IDF room
No disruptions or glitches to critical systems during the transition
We’re proud of the Amber team for delivering a project that strengthens resiliency, safety, and future growth for our client’s operations.